| Year |
Project Name |
Fibers No. |
QTY (KM) |
| 2008 |
150kV T/L for Barikin – Tanjung in Kalimantan |
12 |
62 |
|
|
|
|
| 2010 |
Kalimantan |
12 |
127 |
|
|
|
|
| 2011 |
Java-Bali B3 |
24 |
86 |
|
|
|
|
| 2013 |
Java-Bali B3 |
24 |
107 |
|
|
|
|
| 2015 |
Peusangan |
12 |
75 |
|
|
|
|
| 2016 |
T/L 70kV Sangatta CFPP – Suwandi Substation |
24 |
10.32 |
|
|
|
|
| 2017 |
SUTET 500kV Batang – Mandirancan Seksi 1 |
24 |
86 |
| 2017 |
SUTET 500kV Batang – Mandirancan Seksi 2 |
24 |
86 |
|
|
|
|
| 2018 |
SUTET 500kV Ungaran – Batang |
24 |
91.45 |
| 2018 |
SUTET 500kV Indramayu – Cibatu Baru |
24 |
106 |
| 2018 |
SUTET 500kV Suralaya Lama – Balaraja sirkit 2 |
24 |
62.747 |
| 2018 |
SUTT 150kV Tj.Redeb-Tanjung Selor Sec.2 |
12 |
52 |
| 2018 |
SUTET 500kV Suralaya Balaraja |
24 |
67 |
| 2018 |
T/L 150kV Punagaya – Tanjung Bunga Sec.1 |
12 |
31.28 |
| 2018 |
Pembangunan Saluran Udara tegangan extra tinggi (SUTET) 500kV TX Mandarincan – PLTU Indramayu |
24 |
95.4 |
| 2018 |
T/L 150kV GI Kendari-Puuwatu |
12 |
14.81 |
| 2018 |
Pembangunan Transmisi TL Rengat-Teluk Kuantan Sec1 |
24 |
80 |
| 2018 |
T/L 150kV Topoyo – Pasangkayu Sec1 |
12 |
44.85 |
| 2018 |
SUTT 150kV GI. Tidang Pale-GI Malinau Sec1 |
12 |
24 |
| 2018 |
SUTT 150kV GI New Samarinda – GI Sambera |
12 |
28 |
| 2018 |
T/L 150kV Rengat – Tembilahan Riau |
24 |
23.239 |
| 2018 |
Pengadaan Isolator,GSW dan Asesories Transmisi |
24 |
20 |
| 2018 |
SUTT 150kV Ketapang-Kendawangan Sec2 |
24 |
26.298 |
| 2018 |
Pekerjaan Pengadaan Material Cadang konduktor – Pengadaan Material Cadang Konduktor Dan Earthwire Berikut Aksesorisnya |
24 |
8 |